Hacker News new | past | comments | ask | show | jobs | submit login

What about the peaks when motors turn on. I'm thinking blowers cycling for hot air heating or the mentioned pump for the well. If you're measuring for wattage you need to capture the peaks which will only last a few seconds.

You also need to account for multiple motors turning on simultaneously which you may not catch with a simple measurement. You need to understand what the demands for power are as well.




Most generators can handle short peaks of around +25%.

They are even rated that way 3200/4000 is a typical rating.

Size for the normal load, and let the peak rating handle the startup currents.




Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: