Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

Yes horizontal loop, 200 metre trench ~2m deep with 6 pipes at the bottom. Took 3 days for a 20 ton excavator to dig and fill in the trench. Maybe I got lucky with the installer but it wasn't eyewatering. Vertical loops do cost a lot more. Repairing the lawn with turf or professional landscaping would have cost more than the install, so I did it myself with a tractor, some spare topsoil, and a few bags of Costco grass seed.




Consider applying for YC's Winter 2026 batch! Applications are open till Nov 10

Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: