I had the same experience in Shanghai with a similar top tier agency. I was hired by a Fortune 500 apparel brand to be their digital project manager to handle the agency and Q/C deliverables.
It was 2013, but even then I was blown away by the extent to which the engineers on their end didn't use any modern version control. All of the deliverables were send over FTP updates, and zipped file directories.
It was 2013, but even then I was blown away by the extent to which the engineers on their end didn't use any modern version control. All of the deliverables were send over FTP updates, and zipped file directories.