”how do you ramp up car manufacturing from 2500 to 5000 to 10,000 per week and reduce CapEx at the same time.”
That could be possible if the production line for the larger production rates is mostly done, and all that’s needed is fine-tuning robots, training personnel, and starting to run the factory 24/7.