Electric Retailers in Texas are stuck with this ask on ancillary charges. On an average 300x - 400x on a seven day spend. ERCOT chose to keep lights on in some areas, and take it down in other areas to prevent a grid collapse. All these utilities and generators who are now waiting for $2 billion payouts ( not because they actually incurred the cost, instead the algorithm designed to run at peak load kicked in ) instead would have been waiting for the grid to come back up and running up losses. Legislature/ ERCOT / PUC, needs to declare this as ‘act of nature / whatever’ , backdate a clause in the ancillary charges declaring a minimum load based on QSE (Qualified Scheduling Entities that ask for the buy the previous day or before) forecasts to be on the grid. Generators / Utilities now have learnt they can make money on such event, will trigger this a lot more in the future, every minor excuse they can find.
Targets are businesses with software systems and applications that are to be developed and maintained at a smaller scale but need continued access to technical talent.
After being a Software Developer for 15+ yrs, learning marketing & sales :)
I ran into this issue couple of years and have been iterating on a model, that seems to be working. If you're interested in hearing more about it, ping me please. My email is in my profile.
Checkout http://builtwith.com. If the css is not renamed, merged or minified it will be listed in the technologies used. Else, you have to do the one of the other suggestions here.
We are building a similar thing for non technical users.